The Stages of a Construction Project Life Cycle: From Planning to Handover

Introduction

Sophisticated building initiatives encompass numerous phases, from preparation through their execution. To guarantee an effective project result, every phase possesses particular specifications and difficulties that should be overcome. All of the project’s participants, including proprietors, designers, builders, and independent contractors are able to handle and carry out the undertaking more efficiently by being aware of its phases. We will give an in-depth explanation of the phases within the life cycle of a building venture within this blog.

1) Pre-Construction Phase

The pre-construction stage, which is the very initial phase within the life phases of a building undertaking, occurs when everyone involved in the project gathers collectively to set objectives for the project, evaluate the viability of the venture, and formulate an action plan. This phase entails:

  • Location preference:
    It’s crucial to choose an appropriate place for the endeavor. It entails taking into account elements like convenience, regulations regarding zoning, the impact on the environment, as well as the reach of amenities.

  • Feasibility Analysis:
    A feasibility analysis examines the potential success of a project by taking into account its technological, monetary along with legal implications.

  • Design Creation:
    Choosing the most appropriate design for the undertaking and creating preliminary designs are part of the design creation step.

  • Expense Assessment:
    The expense assessment step entails creating a financial plan for the construction work that takes into account all expenses like labor, supplies, and machinery.

  • BIM and CAD Services:
    BIM as well as CAD services have been utilized frequently to produce 3D models and designs throughout the pre-construction stage, which aids parties in visualizing the building project and spotting possible shortcomings in the design. Contrarily, precise
    3D and 2D renderings of the building plan can be produced using CAD (Computer-Aided Design) Services. These diagrams may be utilized to see the design in action and spot any possible problems. Construction records, which include floor plans, elevations, as well as sections, that must be submitted for getting authorization and permission, may be generated as well using CAD.

 

2) Construction Phase

The execution of the project design as well as the start of the real building activity occurs during the construction phase, which is the next phase within the life cycle of a construction project. This phase entails:

  • Procurement:
    The process of procurement entails buying the supplies, machinery, as well as labor needed to complete the job. The procurement period entails the choice and procurement of the necessary supplies, tools, and labor for the building project. BIM and CAD services may be deployed at this time to speed up the procurement procedure and guarantee that the supplies and devices are in compliance with the project specifications.

  • Construction:
    The genuine work associated with building, which includes excavation, foundation work, building foundations, plumbing, and electric job, as well as closing jobs, takes place during the construction period.

  • Quality control:
    Verifying that the building work complies with the necessary requirements and guidelines is known as quality control.

  • Health and Safety:
    In order to guarantee the security of both employees as well as the general public, safety, and health precautions are of the utmost importance throughout the building process.

  • BIM and CAD Services:
    Throughout the building phase, BIM, as well as CAD services, are heavily utilized for controlling construction agendas, monitoring the development of the project, and supervising tasks related to construction. The creation of a thorough resources plan using
    BIM Services might be utilized for tracking material deliveries and making confident they arrive on deadline. To guarantee that the supplies and machinery satisfy the project prerequisites, comprehensive machinery and supplies requirements may be developed through CAD services.

 

3) Post-construction phase

The post-construction phase marks the end of the building project life cycle when the construction site gets turned across to the proprietor after the construction work has been completely finished. This phase entails:

  • Commissioning:
    In order to ensure that all devices and systems have been operationally sound and up to requirements, commissioning includes inspection and verification.

  • Training and documentation:
    Giving the business proprietor the necessary instruction or training and paperwork, they need to manage and upkeep the building is referred to as documentation and training.

  • Handover:
    The building is turned into the hands of the proprietor during the handover phase, and they are asked to certify that the construction work is finished.

  • Maintenance:
    To guarantee the facility’s continuous functioning, maintenance entails routine inspections and repairs.

  • BIM and CAD Services:
    The facility is maintained along with any design changes will be handled throughout the post-construction period with the help of BIM as well as CAD services.

 

Conclusion

In a nutshell, knowing the phases of the building project’s life cycle serves as a vital phase for assuring that the project will succeed. In order to guarantee the achievement of the project, particular necessities, and obstacles have to be met during each step. From the creation of designs to maintaining the facility, BIM, as well as CAD Services, are crucial at every step of the construction project life period. Construction endeavors might be successfully managed and carried out by stakeholders in the project by utilizing these tools.