{"id":6555,"date":"2026-07-23T08:39:35","date_gmt":"2026-07-23T08:39:35","guid":{"rendered":"https:\/\/www.qecad.com\/cadblog\/?p=6555"},"modified":"2026-07-23T08:51:47","modified_gmt":"2026-07-23T08:51:47","slug":"design-development-vs-construction-documentation-understanding-the-hidden-sources-of-errors","status":"publish","type":"post","link":"https:\/\/www.qecad.com\/cadblog\/design-development-vs-construction-documentation-understanding-the-hidden-sources-of-errors\/","title":{"rendered":"Design Development vs Construction Documentation: Understanding the Hidden Sources of Errors"},"content":{"rendered":"<p><span style=\"text-decoration: underline;\"><b>Introduction<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Construction projects rarely fail because of a single major mistake. More often, costly delays, reworks and coordination issues stem from inaccuracies that originates during the design development or become amplified during the construction documentation. Understanding where errors typically occur and how they impact the project delivery is essential for the architects, engineers, contractors and owners seeking better outcomes.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">While both phases are interconnected, each serves a distinct purpose and presents unique risks. Identifying these vulnerabilities early enables the project teams to establish stronger workflows and reduce the downstream complications.<\/span><\/p>\n<p><b>\u00a0<\/b><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Understanding Design Development<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Design Development (DD) transforms the conceptual ideas into a coordinated and technically refined design. During this phase, architectural layouts, structural systems, MEP configurations, material selections and spatial requirements are progressively defined.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><span style=\"font-weight: 400;\">Key activities includes:<\/span><\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Refining floor plans and elevations.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Establishing structural and MEP systems.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Developing material specifications.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Performing interdisciplinary coordination.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Evaluating constructability and compliance requirements.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The objective is to convert the design intent into a buildable framework before the detailed documentation begins.<\/span><\/p>\n<p><b>\u00a0<\/b><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Understanding Construction Documentation<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Construction Documentation (CD) represents the final set of drawings and specifications used for bidding, permitting, fabrication and construction. These documents communicates the precise dimensions, assemblies, schedules, notes and technical requirements.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><span style=\"font-weight: 400;\">Typical deliverables includes:<\/span><\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Architectural drawings.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Structural drawings.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">MEP drawings.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Door and window schedules.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Finish schedules.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Sections and details.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Specifications and general notes.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">High-quality <\/span><b>Construction Drawing Services<\/b><span style=\"font-weight: 400;\"> ensures that these documents accurately convey the finalized design intent and minimizes the ambiguities during the construction.<\/span><\/p>\n<p><b>\u00a0<\/b><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Common Errors During Design Development<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Although DD focuses on coordination, several issues frequently emerges:<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Incomplete Interdisciplinary Coordination<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Architectural, structural and MEP systems are often developed independently. Without proper collaboration, conflicts remain unnoticed until later stages.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Examples:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Ducts intersecting structural beams.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Equipment rooms lacking sufficient clearance.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Ceiling heights conflicting with mechanical systems.<\/span><\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline;\"><b>Frequent Design Changes<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Owners and stakeholders may revise layouts, materials or functionality during the development. If modifications are not consistently communicated, inconsistencies propagates into later documents.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Lack of Constructability Review<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Design solutions that appear feasible on paper may prove impractical during construction thus leading to the redesign and schedule impacts.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Undefined Materials and Systems<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Insufficient specification of assemblies and products can create uncertainty during the documentation and procurement.<\/span><\/p>\n<p><b>\u00a0<\/b><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Common Errors During Construction Documentation<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Construction documentation errors are generally more expensive because they directly affect field execution.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Inconsistent Drawings<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Plans, sections, elevations and schedules may contain conflicting information.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><span style=\"font-weight: 400;\">Examples includes:<\/span><\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Different dimensions across views.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Mismatched room names.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Missing annotations and tags.<\/span><\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline;\"><b>Omissions<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">One of the most frequent causes of RFIs and change orders is incomplete documentation.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><span style=\"font-weight: 400;\">Common omissions includes:<\/span><\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Missing details.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Undefined connections.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Incomplete schedules.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Unspecified finishes.<\/span><\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline;\"><b>Dimensioning Errors<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Incorrect dimensions can result in fabrication problems, installation conflicts and material wastes.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Coordination Failures<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Changes introduced late in the design process may not be reflected across all the disciplines, causing clashes between systems.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Revision Management Issues<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Improper version control often results in outdated drawings reaching contractors or fabricators, creating confusion and rework.<\/span><\/p>\n<p><b>\u00a0<\/b><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Where Do Most Errors Actually Occur?<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Although many coordination challenges originates during the Design Development, industry experience shows that the majority of costly errors become evident during the Construction Documentation and construction execution.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Errors Originating in Design Development<\/b><\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Inadequate coordination.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Incomplete decisions.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Unresolved spatial conflicts.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Late design modifications.<\/span><\/li>\n<\/ul>\n<p><span style=\"text-decoration: underline;\"><b>Errors Manifesting in Construction Documentation<\/b><\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Missing information.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Drawing discrepancies.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Incorrect dimensions.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Coordination mismatches.<\/span><\/li>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Specification inconsistencies.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">In other words, Design Development creates the foundation, while Construction Documentation exposes and amplifies unresolved issues. Errors that remain unnoticed during DD become significantly more expensive once they appear in CD.<\/span><\/p>\n<p><b>\u00a0<\/b><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Why Documentation Errors Have Greater Financial Impact?<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">The cost of correcting errors increases dramatically as projects progress.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Project Phase<\/b><\/td>\n<td><b>Relative Cost of Correction<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Concept Design<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Low<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Design Development<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Moderate<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Construction Documentation<\/span><\/td>\n<td><span style=\"font-weight: 400;\">High<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Construction Phase<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Very High<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Post-Construction<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Extremely High<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A simple coordination issue identified during DD may require only hours to resolve, whereas the same issue discovered on-site could result in delays, change orders, material waste, and labor disruptions.<\/span><\/p>\n<p><b>\u00a0<\/b><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Strategies to Minimize Errors<\/b><\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Strengthen Early Coordination<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Regular collaboration between architecture, structure, and MEP disciplines helps identify clashes before documentation begins.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Standardize Drawing Procedures<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Consistent templates, naming conventions, and quality-control processes improve document accuracy.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Implement Multi-Level Reviews<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Peer reviews and interdisciplinary checks can detect inconsistencies before drawings are issued.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Leverage Digital Workflows<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Modern CAD Drawing Services and BIM platforms facilitate clash detection, revision management, and enhanced collaboration among stakeholders.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Maintain Strict Version Control<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Document management systems help ensure that teams work from the latest approved drawings.<\/span><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Conduct Constructability Assessments<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Early contractor involvement and constructability reviews help identify potential field issues before they become costly problems.<\/span><\/p>\n<p><b>\u00a0<\/b><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Conclusion<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Design Development and Construction Documentation are not competing phases; they are sequential processes that depend heavily on each other. While many errors originate during Design Development, the most expensive and disruptive problems typically surface during Construction Documentation because unresolved issues become embedded within the documents used for construction.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Successful projects rely on rigorous coordination, disciplined review processes, and accurate documentation. By investing in quality control throughout both stages, project teams can significantly reduce RFIs, change orders, delays, and costly rework, ultimately delivering more predictable and efficient construction outcomes.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction Construction projects rarely fail because of a single major mistake. More often, costly delays, reworks and coordination issues stem from inaccuracies that originates during the design development or become amplified during the construction documentation. Understanding where errors typically occur and how they impact the project delivery is essential for the architects, engineers, contractors and &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/www.qecad.com\/cadblog\/design-development-vs-construction-documentation-understanding-the-hidden-sources-of-errors\/\"> <span class=\"screen-reader-text\">Design Development vs Construction Documentation: Understanding the Hidden Sources of Errors<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":11,"featured_media":6556,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":""},"categories":[33,245,323],"tags":[358,340,351],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Design Development vs Construction Documentation: Understanding the Hidden Sources of Errors<\/title>\n<meta name=\"description\" content=\"Design Development vs Construction Documentation: Discover key differences and hidden errors that affect project quality and delivery.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.qecad.com\/cadblog\/design-development-vs-construction-documentation-understanding-the-hidden-sources-of-errors\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Design Development vs Construction Documentation: Understanding the Hidden Sources of Errors\" \/>\n<meta property=\"og:description\" content=\"Design Development vs Construction Documentation: Discover key differences and hidden errors that affect project quality and delivery.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.qecad.com\/cadblog\/design-development-vs-construction-documentation-understanding-the-hidden-sources-of-errors\/\" \/>\n<meta property=\"og:site_name\" content=\"QeCAD\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-23T08:39:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-23T08:51:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.qecad.com\/cadblog\/wp-content\/uploads\/2026\/07\/Design-Development-vs-Construction-Documentation-Understanding-the-Hidden-Sources-of-Errors.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"3000\" \/>\n\t<meta property=\"og:image:height\" content=\"1800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Dolly Bulchandani\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Dolly Bulchandani\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.qecad.com\/cadblog\/design-development-vs-construction-documentation-understanding-the-hidden-sources-of-errors\/\",\"url\":\"https:\/\/www.qecad.com\/cadblog\/design-development-vs-construction-documentation-understanding-the-hidden-sources-of-errors\/\",\"name\":\"Design Development vs Construction Documentation: Understanding the Hidden Sources of Errors\",\"isPartOf\":{\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#website\"},\"datePublished\":\"2026-07-23T08:39:35+00:00\",\"dateModified\":\"2026-07-23T08:51:47+00:00\",\"author\":{\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/8c56b3524c1adbaee80844e72cae12b1\"},\"description\":\"Design Development vs Construction Documentation: Discover key differences and hidden errors that affect project quality and delivery.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.qecad.com\/cadblog\/design-development-vs-construction-documentation-understanding-the-hidden-sources-of-errors\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#website\",\"url\":\"https:\/\/www.qecad.com\/cadblog\/\",\"name\":\"QeCAD\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.qecad.com\/cadblog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/8c56b3524c1adbaee80844e72cae12b1\",\"name\":\"Dolly Bulchandani\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g\",\"caption\":\"Dolly Bulchandani\"},\"url\":\"https:\/\/www.qecad.com\/cadblog\/author\/dollybulchandani\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Design Development vs Construction Documentation: Understanding the Hidden Sources of Errors","description":"Design Development vs Construction Documentation: Discover key differences and hidden errors that affect project quality and delivery.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.qecad.com\/cadblog\/design-development-vs-construction-documentation-understanding-the-hidden-sources-of-errors\/","og_locale":"en_US","og_type":"article","og_title":"Design Development vs Construction Documentation: Understanding the Hidden Sources of Errors","og_description":"Design Development vs Construction Documentation: Discover key differences and hidden errors that affect project quality and delivery.","og_url":"https:\/\/www.qecad.com\/cadblog\/design-development-vs-construction-documentation-understanding-the-hidden-sources-of-errors\/","og_site_name":"QeCAD","article_published_time":"2026-07-23T08:39:35+00:00","article_modified_time":"2026-07-23T08:51:47+00:00","og_image":[{"width":3000,"height":1800,"url":"https:\/\/www.qecad.com\/cadblog\/wp-content\/uploads\/2026\/07\/Design-Development-vs-Construction-Documentation-Understanding-the-Hidden-Sources-of-Errors.jpg","type":"image\/jpeg"}],"author":"Dolly Bulchandani","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Dolly Bulchandani","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.qecad.com\/cadblog\/design-development-vs-construction-documentation-understanding-the-hidden-sources-of-errors\/","url":"https:\/\/www.qecad.com\/cadblog\/design-development-vs-construction-documentation-understanding-the-hidden-sources-of-errors\/","name":"Design Development vs Construction Documentation: Understanding the Hidden Sources of Errors","isPartOf":{"@id":"https:\/\/www.qecad.com\/cadblog\/#website"},"datePublished":"2026-07-23T08:39:35+00:00","dateModified":"2026-07-23T08:51:47+00:00","author":{"@id":"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/8c56b3524c1adbaee80844e72cae12b1"},"description":"Design Development vs Construction Documentation: Discover key differences and hidden errors that affect project quality and delivery.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.qecad.com\/cadblog\/design-development-vs-construction-documentation-understanding-the-hidden-sources-of-errors\/"]}]},{"@type":"WebSite","@id":"https:\/\/www.qecad.com\/cadblog\/#website","url":"https:\/\/www.qecad.com\/cadblog\/","name":"QeCAD","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.qecad.com\/cadblog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/8c56b3524c1adbaee80844e72cae12b1","name":"Dolly Bulchandani","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g","caption":"Dolly Bulchandani"},"url":"https:\/\/www.qecad.com\/cadblog\/author\/dollybulchandani\/"}]}},"_links":{"self":[{"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/posts\/6555"}],"collection":[{"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/comments?post=6555"}],"version-history":[{"count":2,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/posts\/6555\/revisions"}],"predecessor-version":[{"id":6558,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/posts\/6555\/revisions\/6558"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/media\/6556"}],"wp:attachment":[{"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/media?parent=6555"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/categories?post=6555"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/tags?post=6555"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}