{"id":5570,"date":"2025-02-28T05:19:25","date_gmt":"2025-02-28T05:19:25","guid":{"rendered":"https:\/\/www.qecad.com\/cadblog\/?p=5570"},"modified":"2026-02-05T13:09:04","modified_gmt":"2026-02-05T13:09:04","slug":"navigating-the-building-safety-act-the-role-of-gateway-3","status":"publish","type":"post","link":"https:\/\/www.qecad.com\/cadblog\/navigating-the-building-safety-act-the-role-of-gateway-3\/","title":{"rendered":"Navigating the Building Safety Act: The Role of Gateway 3"},"content":{"rendered":"<p><span style=\"text-decoration: underline;color: #000000\"><b>Introduction<\/b><\/span><\/p>\n<p><span style=\"color: #000000\"><span style=\"font-weight: 400\">The <\/span><b>Building Safety Act 2022<\/b><span style=\"font-weight: 400\"> introduced a landmark framework for ensuring the safety of the high-rise buildings in the UK. A crucial part of this framework is the <\/span><b>three-gateway approval system<\/b><span style=\"font-weight: 400\">, which governs the safety of the buildings throughout their lifecycle. Among these, <\/span><b>Gateway 3<\/b><span style=\"font-weight: 400\"> is the final checkpoint before the occupation which ensures that the building meets the highest safety standards before the residents or occupants move in.<\/span><\/span><\/p>\n<p><span style=\"color: #000000\"><span style=\"font-weight: 400\">This blog explores the <\/span><b>Gateway 3<\/b><span style=\"font-weight: 400\"> in detail, its requirements and its impact on the construction industry as a whole.<\/span><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"text-decoration: underline;color: #000000\"><b>Understanding the Building Safety Act: What Does It Mean?<\/b><\/span><\/p>\n<p><span style=\"color: #000000\"><span style=\"font-weight: 400\">The Building Safety Act 2022 was enacted in response to the Grenfell Tower tragedy to strengthen building safety regulations and improve accountability within the construction industry. The Act applies quite stringent measures to the high-rise buildings particularly to those which are <\/span><b>over 18 meters or seven storeys high<\/b><span style=\"font-weight: 400\"> with at least <\/span><b>two residential units<\/b><span style=\"font-weight: 400\">. It also establishes the new regulatory bodies such as the <\/span><b>Building Safety Regulator (BSR)<\/b><span style=\"font-weight: 400\"> to oversee the compliance.<\/span><\/span><\/p>\n<p><span style=\"color: #000000\"><b>\u00a0<\/b><\/span><\/p>\n<p><span style=\"text-decoration: underline;color: #000000\"><b>Understanding the Three-Gateway System<\/b><\/span><\/p>\n<p><span style=\"color: #000000\"><span style=\"font-weight: 400\">The Building Safety Act introduced a <\/span><b>three-step gateway process<\/b><span style=\"font-weight: 400\"> for high-rise buildings to ensure the safety compliance from the design to the occupation:<\/span><\/span><\/p>\n<ol>\n<li><span style=\"text-decoration: underline;color: #000000\"><b> Gateway 1 \u2013 Planning Stage<\/b><\/span><\/li>\n<\/ol>\n<p><span style=\"color: #000000\"><span style=\"font-weight: 400\">Gateway 1 is the <\/span><b>first and foremost stage of approval <\/b><span style=\"font-weight: 400\">and takes place at the <\/span><b>planning permission stage<\/b><span style=\"font-weight: 400\">. It ensures that the fire safety considerations are integrated into the early designs of the building. Key requirements includes:<\/span><\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><span style=\"font-weight: 400\">A <\/span><b>Fire Statement<\/b><span style=\"font-weight: 400\">, which must outline how fire safety has been considered in the design and how it will be managed once it is built.<\/span><\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><span style=\"font-weight: 400\">Assessment of the <\/span><b>site layout, escape routes along with the emergency accesses<\/b><span style=\"font-weight: 400\"> for the fire and rescue services.<\/span><\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><span style=\"font-weight: 400\">Ensuring the <\/span><b>early-stage compliance<\/b><span style=\"font-weight: 400\"> with the fire safety objectives thereby reducing the risk of costly design changes at later stages.<\/span><\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><span style=\"font-weight: 400\">Consideration of the <\/span><a href=\"https:\/\/www.qecad.com\/as-built-drawing-services.php\"><b>As Built Drawing Services<\/b><\/a><span style=\"font-weight: 400\"> to ensure that the fire safety measures aligns well with the final construction plans.<\/span><\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<ol start=\"2\">\n<li><span style=\"text-decoration: underline;color: #000000\"><b> Gateway 2 \u2013 Pre-Construction Stage<\/b><\/span><\/li>\n<\/ol>\n<p><span style=\"color: #000000\"><span style=\"font-weight: 400\">Gateway 2 occurs <\/span><b>before the construction begins<\/b><span style=\"font-weight: 400\"> and acts as a rigorous <\/span><b>regulatory checkpoint<\/b><span style=\"font-weight: 400\">. At this stage:<\/span><\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><span style=\"font-weight: 400\">A detailed building safety assessment must be submitted and authorized by the <\/span><b>Building Safety Regulator (BSR)<\/b><span style=\"font-weight: 400\"> before the work starts.<\/span><\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><span style=\"font-weight: 400\">Developers must provide the <\/span><b>detailed fire and structural safety plans<\/b><span style=\"font-weight: 400\"> including materials, construction techniques as well as the safety management strategies.<\/span><\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><span style=\"font-weight: 400\">It replaces the traditional <\/span><b>Building Control approval process<\/b><span style=\"font-weight: 400\"> for the high-rise buildings.<\/span><\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><span style=\"font-weight: 400\">Gateway 2 ensures that the <\/span><b>designs meets the safety standards before even the physical construction begins<\/b><span style=\"font-weight: 400\"> thereby minimizing the risks and errors during the build phase.<\/span><\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><a href=\"https:\/\/www.qecad.com\/mep-bim-services.php\"><b>Revit MEP Services<\/b><\/a><span style=\"font-weight: 400\"> play a crucial role in ensuring that the mechanical, electrical as well as the plumbing systems comply well with the safety regulations and integrate seamlessly into the overall building design.<\/span><\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<ol start=\"3\">\n<li><span style=\"text-decoration: underline;color: #000000\"><b> Gateway 3 \u2013 Pre-Occupation Stage<\/b><\/span><\/li>\n<\/ol>\n<p><span style=\"color: #000000\"><b>Gateway 3<\/b><span style=\"font-weight: 400\"> is the last approval stage in the new regulatory framework. It acts as the final validation step to confirm that the building complies with the approved safety standards.<\/span><\/span><\/p>\n<p><span style=\"color: #000000\"><b>Key Aspects of Gateway 3:<\/b><\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><b>Completion and Compliance Check:<\/b><span style=\"font-weight: 400\"> The <\/span><b>Accountable Person<\/b><span style=\"font-weight: 400\"> must submit a \u2018Completion Certificate Application\u2019 to confirm that the building complies well with the safety regulations.<\/span><\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><b>Golden Thread of Information:<\/b><span style=\"font-weight: 400\"> A structured digital record (Golden Thread) must be submitted detailing all the safety and critical information about the building.<\/span><\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><b>Final Approval by the Building Safety Regulator (BSR):<\/b><span style=\"font-weight: 400\"> The BSR assesses whether the building meets the fire and structural safety requirements before issuing an <\/span><b>occupation certificate<\/b><span style=\"font-weight: 400\">.<\/span><\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000\"><b>\u00a0<\/b><\/span><\/p>\n<p><span style=\"text-decoration: underline;color: #000000\"><b>Gateway 3 Requirements<\/b><\/span><\/p>\n<p><span style=\"color: #000000\"><span style=\"font-weight: 400\">To pass <\/span><b>Gateway 3<\/b><span style=\"font-weight: 400\">, developers and responsible parties must:<\/span><\/span><\/p>\n<ol>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><b>Submit a Completion Certificate Application<\/b><span style=\"font-weight: 400\"> \u2013 This includes the detailed evidence proving that the completed building meets the safety regulations.<\/span><\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><b>Provide the Golden Thread of Information<\/b><span style=\"font-weight: 400\"> \u2013 A comprehensive digital record of the design, construction as well as the ongoing safety management.<\/span><\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><b>Obtain an Occupation Certificate<\/b><span style=\"font-weight: 400\"> \u2013 The BSR will assess the compliance before allowing the building to be occupied.<\/span><\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"color: #000000\"><b>Address Any Outstanding Safety Issues<\/b><span style=\"font-weight: 400\"> \u2013 No one can move into the building unless all the safety concerns have been resolved.<\/span><\/span><\/li>\n<\/ol>\n<p><span style=\"color: #000000\"><b>\u00a0<\/b><\/span><\/p>\n<p><span style=\"text-decoration: underline;color: #000000\"><b>Impact on the Construction Industry<\/b><\/span><\/p>\n<ol>\n<li><span style=\"color: #000000\"><b> Increased Responsibility for the Developers and the Accountable Persons<\/b><\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;color: #000000\">The Developers must maintain a transparent and documented approach towards the safety right from the start to the final finish.<\/span><\/p>\n<ol start=\"2\">\n<li><span style=\"color: #000000\"><b> Stronger Regulatory Oversight<\/b><\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;color: #000000\">The Building Safety Regulator has the authority to withhold the occupancy approval if the safety standards are not met.<\/span><\/p>\n<ol start=\"3\">\n<li><span style=\"color: #000000\"><b> Longer Approval Process<\/b><\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;color: #000000\">The additional safety checks and documentation requirements may extend the project timelines but also ensure a full to safer buildings.<\/span><\/p>\n<ol start=\"4\">\n<li><span style=\"color: #000000\"><b> Higher Costs for Non-Compliance<\/b><\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;color: #000000\">Any failures to comply with the Gateway 3 could result in the costly project delays, legal actions as well as the reputational damages.<\/span><\/p>\n<p><span style=\"color: #000000\"><b>\u00a0<\/b><\/span><\/p>\n<p><span style=\"color: #000000\"><b>\u00a0<\/b><\/span><\/p>\n<p><span style=\"text-decoration: underline;color: #000000\"><b>Conclusion<\/b><\/span><\/p>\n<p><span style=\"color: #000000\"><span style=\"font-weight: 400\">The Gateway 3 represents a <\/span><b>critical milestone<\/b><span style=\"font-weight: 400\"> in ensuring that the high-risk buildings meets the stringent safety standards before occupation. While it may introduce the additional compliance requirements and extend the project timelines but it ultimately enhances the safety for the residents as well as the building users.<\/span><\/span><\/p>\n<p><span style=\"color: #000000\"><span style=\"font-weight: 400\">For the developers, contractors as well as the building owners, understanding and preparing for the <\/span><b>Gateway 3<\/b><span style=\"font-weight: 400\"> is essential to ensure the compliance with the <\/span><b>Building Safety Act 2022<\/b><span style=\"font-weight: 400\"> and to avoid any unnecessary delays. By implementing the robust safety measures and maintaining the <\/span><b>Golden Thread of Information<\/b><span style=\"font-weight: 400\">, the industry can move towards a more safer built environment.<\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction The Building Safety Act 2022 introduced a landmark framework for ensuring the safety of the high-rise buildings in the UK. A crucial part of this framework is the three-gateway approval system, which governs the safety of the buildings throughout their lifecycle. Among these, Gateway 3 is the final checkpoint before the occupation which ensures &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/www.qecad.com\/cadblog\/navigating-the-building-safety-act-the-role-of-gateway-3\/\"> <span class=\"screen-reader-text\">Navigating the Building Safety Act: The Role of Gateway 3<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":11,"featured_media":6254,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":""},"categories":[347,346],"tags":[421,98,420,487],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Navigating the Building Safety Act: The Role of Gateway 3<\/title>\n<meta name=\"description\" content=\"Explore Gateway 3&#039;s role in the Building Safety Act, ensuring compliance, risk management, and safety in construction projects.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.qecad.com\/cadblog\/navigating-the-building-safety-act-the-role-of-gateway-3\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Navigating the Building Safety Act: The Role of Gateway 3\" \/>\n<meta property=\"og:description\" content=\"Explore Gateway 3&#039;s role in the Building Safety Act, ensuring compliance, risk management, and safety in construction projects.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.qecad.com\/cadblog\/navigating-the-building-safety-act-the-role-of-gateway-3\/\" \/>\n<meta property=\"og:site_name\" content=\"QeCAD\" \/>\n<meta property=\"article:published_time\" content=\"2025-02-28T05:19:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-05T13:09:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.qecad.com\/cadblog\/wp-content\/uploads\/2025\/02\/Navigating-the-Building-Safety-Act-The-Role-of-Gateway-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"3000\" \/>\n\t<meta property=\"og:image:height\" content=\"1800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Dolly Bulchandani\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Dolly Bulchandani\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.qecad.com\/cadblog\/navigating-the-building-safety-act-the-role-of-gateway-3\/\",\"url\":\"https:\/\/www.qecad.com\/cadblog\/navigating-the-building-safety-act-the-role-of-gateway-3\/\",\"name\":\"Navigating the Building Safety Act: The Role of Gateway 3\",\"isPartOf\":{\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#website\"},\"datePublished\":\"2025-02-28T05:19:25+00:00\",\"dateModified\":\"2026-02-05T13:09:04+00:00\",\"author\":{\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/8c56b3524c1adbaee80844e72cae12b1\"},\"description\":\"Explore Gateway 3's role in the Building Safety Act, ensuring compliance, risk management, and safety in construction projects.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.qecad.com\/cadblog\/navigating-the-building-safety-act-the-role-of-gateway-3\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#website\",\"url\":\"https:\/\/www.qecad.com\/cadblog\/\",\"name\":\"QeCAD\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.qecad.com\/cadblog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/8c56b3524c1adbaee80844e72cae12b1\",\"name\":\"Dolly Bulchandani\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g\",\"caption\":\"Dolly Bulchandani\"},\"url\":\"https:\/\/www.qecad.com\/cadblog\/author\/dollybulchandani\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Navigating the Building Safety Act: The Role of Gateway 3","description":"Explore Gateway 3's role in the Building Safety Act, ensuring compliance, risk management, and safety in construction projects.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.qecad.com\/cadblog\/navigating-the-building-safety-act-the-role-of-gateway-3\/","og_locale":"en_US","og_type":"article","og_title":"Navigating the Building Safety Act: The Role of Gateway 3","og_description":"Explore Gateway 3's role in the Building Safety Act, ensuring compliance, risk management, and safety in construction projects.","og_url":"https:\/\/www.qecad.com\/cadblog\/navigating-the-building-safety-act-the-role-of-gateway-3\/","og_site_name":"QeCAD","article_published_time":"2025-02-28T05:19:25+00:00","article_modified_time":"2026-02-05T13:09:04+00:00","og_image":[{"width":3000,"height":1800,"url":"https:\/\/www.qecad.com\/cadblog\/wp-content\/uploads\/2025\/02\/Navigating-the-Building-Safety-Act-The-Role-of-Gateway-1.jpg","type":"image\/jpeg"}],"author":"Dolly Bulchandani","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Dolly Bulchandani","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.qecad.com\/cadblog\/navigating-the-building-safety-act-the-role-of-gateway-3\/","url":"https:\/\/www.qecad.com\/cadblog\/navigating-the-building-safety-act-the-role-of-gateway-3\/","name":"Navigating the Building Safety Act: The Role of Gateway 3","isPartOf":{"@id":"https:\/\/www.qecad.com\/cadblog\/#website"},"datePublished":"2025-02-28T05:19:25+00:00","dateModified":"2026-02-05T13:09:04+00:00","author":{"@id":"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/8c56b3524c1adbaee80844e72cae12b1"},"description":"Explore Gateway 3's role in the Building Safety Act, ensuring compliance, risk management, and safety in construction projects.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.qecad.com\/cadblog\/navigating-the-building-safety-act-the-role-of-gateway-3\/"]}]},{"@type":"WebSite","@id":"https:\/\/www.qecad.com\/cadblog\/#website","url":"https:\/\/www.qecad.com\/cadblog\/","name":"QeCAD","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.qecad.com\/cadblog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/8c56b3524c1adbaee80844e72cae12b1","name":"Dolly Bulchandani","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g","caption":"Dolly Bulchandani"},"url":"https:\/\/www.qecad.com\/cadblog\/author\/dollybulchandani\/"}]}},"_links":{"self":[{"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/posts\/5570"}],"collection":[{"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/comments?post=5570"}],"version-history":[{"count":4,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/posts\/5570\/revisions"}],"predecessor-version":[{"id":6255,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/posts\/5570\/revisions\/6255"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/media\/6254"}],"wp:attachment":[{"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/media?parent=5570"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/categories?post=5570"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/tags?post=5570"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}