{"id":2983,"date":"2021-07-26T13:06:06","date_gmt":"2021-07-26T13:06:06","guid":{"rendered":"https:\/\/www.qecad.com\/cadblog\/?p=2983"},"modified":"2023-06-08T11:19:56","modified_gmt":"2023-06-08T11:19:56","slug":"outtakes-a-classic-case-of-post-pandemic-architectural-re-modelling","status":"publish","type":"post","link":"https:\/\/www.qecad.com\/cadblog\/outtakes-a-classic-case-of-post-pandemic-architectural-re-modelling\/","title":{"rendered":"Outtakes : a \u2018Classic\u2019 case of post-pandemic architectural re-modelling."},"content":{"rendered":"<p><span style=\"color: #000000;\">Recently, we chanced upon the opportunity to sit down with Garth McAlpin, Director of the renowned <span style=\"color: #0000ff;\"><a style=\"color: #0000ff;\" href=\"https:\/\/classic-arch.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">Classic Architectural Group<\/a><\/span> &#8211; an established design and architectural collective, chiefly based in Australia.<\/span><br \/>\n<span style=\"color: #000000;\">Garth opened up to us about how it&#8217;s been like to manage a design and building-works practice in the midst of the globally-vexing COVID-19 pandemic, and the key role that the advent of remote working played in the course ahead. As challenging as the pandemic has been, it&#8217;s also, in the conduit of time &#8211; proved to be reformative.<\/span><br \/>\n<span style=\"color: #000000;\">In this article, we cover the summation of what it&#8217;s been like for one such recognized firm to chart it&#8217;s way up through the footfalls of the global outbreak.<\/span><\/p>\n<p><span style=\"color: #000000;\">Read through to learn more about the Classic Group&#8217;s perfectly eccentric side what worked and what didn&#8217;t for them, in the course of sustaining an architectural front through the mediums of distant working &#8211;<\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>Firm in Focus :<\/strong><\/span><br \/>\n<span style=\"color: #000000;\"><strong>Classic Architectural Group &#8211;<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">For 38 years, Classic\u2019s mission, to make public spaces safe, attractive and accessible to all, has seen them set the benchmark for quality access solutions &#8211; trusted by building professionals across Australia. The architecture and design collective prides itself to have specialized in fulfilling the complete supply chain &#8211; from design to installation &#8211; to provide a proven service for their clientele, and one that enables them to do what they do best.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\"><strong><b>Can we rely on a purely virtual-meeting realm? \u00a0<\/b><\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">There were always some quick online short discussions involved but the project never relied on those meetings. The essential, detailed meetings always took place face to face in order to share the designs and get client reviews and feedback.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\"><strong><b>The transit from managing a collective physically &#8211; to virtually : <\/b><\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">Managing a team remotely has its benefits and drawbacks. I find it difficult to share instructions and guidance to my team based on virtual models. Physical models allow a more optimal representation of the building and makes the communication and discussion a lot more easier. Either that, or the fact that we have been using physical methods for so long that it is just taking us time to get used to the new norms.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\"><strong><b>Where the core difference between an in-house team vs. an outsourcing unit lies : <\/b><\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">The two are very different from each other. An outsourcing team would still be working the way they used to. With one-time requirement gatherings and a few follow-up meetings, an outsourcing company can get their work done. This is not the same for in-house teams who\u2019ve had to change their processes and methods for the whole work routine.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\"><strong><b>How distant working affects the customer experience : <\/b><\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">Remote meetings were initially not very convincing for clients and it surely had a negative affect on our project wins. However, as time passed we were able to optimize our methods and techniques to achieve a somewhat similar conversion rate for winning projects. As we grew a portfolio of our remote work, it became easier to convince clients.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\"><strong><b>The reaps of remote working : A brief case study &#8211;\u00a0<\/b><\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">A client came to us for a redesigning project for their office since their preparations for returning back to office after the pandemic was already done. In case of redesigning projects we usually design existing physical models and then demonstrate how we are going to redesign it with a whole new idea with the least amount of damage to existing structure. However, this became a lot more difficult to demonstrate using virtual measures. As a result, we had to go out of the way, make videos of demonstrations, make virtual 3-D models and whatnot to convince the client. This is why remote working is a struggle for an architect. The physical or one to one meetings will always have an upper hand in the architectural industry.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Recently, we chanced upon the opportunity to sit down with Garth McAlpin, Director of the renowned Classic Architectural Group &#8211; an established design and architectural collective, chiefly based in Australia. Garth opened up to us about how it&#8217;s been like to manage a design and building-works practice in the midst of the globally-vexing COVID-19 pandemic, &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/www.qecad.com\/cadblog\/outtakes-a-classic-case-of-post-pandemic-architectural-re-modelling\/\"> <span class=\"screen-reader-text\">Outtakes : a \u2018Classic\u2019 case of post-pandemic architectural re-modelling.<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":1,"featured_media":2988,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":""},"categories":[33],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>a \u2018Classic\u2019 case of post-pandemic architectural re-modelling.<\/title>\n<meta name=\"description\" content=\"Explore the case of Outtakes &amp; its post-pandemic architectural re-modelling. Discover how this project exemplifies classic adaptation in new era\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.qecad.com\/cadblog\/outtakes-a-classic-case-of-post-pandemic-architectural-re-modelling\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"a \u2018Classic\u2019 case of post-pandemic architectural re-modelling.\" \/>\n<meta property=\"og:description\" content=\"Explore the case of Outtakes &amp; its post-pandemic architectural re-modelling. Discover how this project exemplifies classic adaptation in new era\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.qecad.com\/cadblog\/outtakes-a-classic-case-of-post-pandemic-architectural-re-modelling\/\" \/>\n<meta property=\"og:site_name\" content=\"QeCAD\" \/>\n<meta property=\"article:published_time\" content=\"2021-07-26T13:06:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-06-08T11:19:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.qecad.com\/cadblog\/wp-content\/uploads\/2021\/07\/My-Post-2021-07-26T183823.438.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"512\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.qecad.com\/cadblog\/outtakes-a-classic-case-of-post-pandemic-architectural-re-modelling\/\",\"url\":\"https:\/\/www.qecad.com\/cadblog\/outtakes-a-classic-case-of-post-pandemic-architectural-re-modelling\/\",\"name\":\"a \u2018Classic\u2019 case of post-pandemic architectural re-modelling.\",\"isPartOf\":{\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#website\"},\"datePublished\":\"2021-07-26T13:06:06+00:00\",\"dateModified\":\"2023-06-08T11:19:56+00:00\",\"author\":{\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/8bfee438bf20ca7bc6f4b676b0ce50a7\"},\"description\":\"Explore the case of Outtakes & its post-pandemic architectural re-modelling. Discover how this project exemplifies classic adaptation in new era\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.qecad.com\/cadblog\/outtakes-a-classic-case-of-post-pandemic-architectural-re-modelling\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#website\",\"url\":\"https:\/\/www.qecad.com\/cadblog\/\",\"name\":\"QeCAD\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.qecad.com\/cadblog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/8bfee438bf20ca7bc6f4b676b0ce50a7\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/666bbd1fface9f7781419bdcc5634b88?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/666bbd1fface9f7781419bdcc5634b88?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"http:\/\/localhost\/qecad\"],\"url\":\"https:\/\/www.qecad.com\/cadblog\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"a \u2018Classic\u2019 case of post-pandemic architectural re-modelling.","description":"Explore the case of Outtakes & its post-pandemic architectural re-modelling. Discover how this project exemplifies classic adaptation in new era","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.qecad.com\/cadblog\/outtakes-a-classic-case-of-post-pandemic-architectural-re-modelling\/","og_locale":"en_US","og_type":"article","og_title":"a \u2018Classic\u2019 case of post-pandemic architectural re-modelling.","og_description":"Explore the case of Outtakes & its post-pandemic architectural re-modelling. Discover how this project exemplifies classic adaptation in new era","og_url":"https:\/\/www.qecad.com\/cadblog\/outtakes-a-classic-case-of-post-pandemic-architectural-re-modelling\/","og_site_name":"QeCAD","article_published_time":"2021-07-26T13:06:06+00:00","article_modified_time":"2023-06-08T11:19:56+00:00","og_image":[{"url":"https:\/\/www.qecad.com\/cadblog\/wp-content\/uploads\/2021\/07\/My-Post-2021-07-26T183823.438.png","width":1024,"height":512,"type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.qecad.com\/cadblog\/outtakes-a-classic-case-of-post-pandemic-architectural-re-modelling\/","url":"https:\/\/www.qecad.com\/cadblog\/outtakes-a-classic-case-of-post-pandemic-architectural-re-modelling\/","name":"a \u2018Classic\u2019 case of post-pandemic architectural re-modelling.","isPartOf":{"@id":"https:\/\/www.qecad.com\/cadblog\/#website"},"datePublished":"2021-07-26T13:06:06+00:00","dateModified":"2023-06-08T11:19:56+00:00","author":{"@id":"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/8bfee438bf20ca7bc6f4b676b0ce50a7"},"description":"Explore the case of Outtakes & its post-pandemic architectural re-modelling. Discover how this project exemplifies classic adaptation in new era","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.qecad.com\/cadblog\/outtakes-a-classic-case-of-post-pandemic-architectural-re-modelling\/"]}]},{"@type":"WebSite","@id":"https:\/\/www.qecad.com\/cadblog\/#website","url":"https:\/\/www.qecad.com\/cadblog\/","name":"QeCAD","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.qecad.com\/cadblog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/8bfee438bf20ca7bc6f4b676b0ce50a7","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qecad.com\/cadblog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/666bbd1fface9f7781419bdcc5634b88?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/666bbd1fface9f7781419bdcc5634b88?s=96&d=mm&r=g","caption":"admin"},"sameAs":["http:\/\/localhost\/qecad"],"url":"https:\/\/www.qecad.com\/cadblog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/posts\/2983"}],"collection":[{"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/comments?post=2983"}],"version-history":[{"count":2,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/posts\/2983\/revisions"}],"predecessor-version":[{"id":4174,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/posts\/2983\/revisions\/4174"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/media\/2988"}],"wp:attachment":[{"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/media?parent=2983"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/categories?post=2983"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.qecad.com\/cadblog\/wp-json\/wp\/v2\/tags?post=2983"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}